CONTROL SYSTEMS -
BEGIN POWER UP PROCEDURE – RESTART
CONTROL SYSTEMS -
ALL SYSTEMS REBOOTING
CONTROL SYSTEMS -
OBSERVED DOWNTIME – 00:02:44
! TACTICAL
ALERT ! – OPFORCE HAS SUCCESSFULLY
BREACHED SECURITY PERIMETER
CONTROL SYSTEMS – STANDBY FOR TEMPORAL WAVE EFFECT –
ESTIMATED 4 SECONDS
SYSTEM PAUSE – [UNKNOWN CAUSE]
CONTROL SYSTEMS – DIAGNOSTIC – FLASH - START
CONTROL SYSTEMS – DIAGNOSTIC – FLASH - PASS
CONTROL SYSTEMS – SCAN FOR TEMPORAL WAVE EFFECT
CONTROL SYSTEMS – NEGATIVE TEMPORAL WAVE EFFECT
DETECTED
CONTROL SYSTEMS – ASSUME NO EFFECT OF CHRONOPORTED MASS
ASSEMBLY COMBAT UNIT ON TIMELINE
CONTROL SYSTEMS – END RESULT – CHRONOPORTING EVENT ONE
– FAILURE
CONTROL SYSTEMS – RESET OPERATIONAL PARAMETERS AND
FACILITY STATUS
CONTROL SYSTEMS – BEGIN CHRONOPORTING EVENT TWO
CONTROL SYSTEMS – TDD RING ARRAY DECELERATION – BEGIN
CONTROL SYSTEMS – AMR – POST POWER RESTART – STANDBY
MODE
CONTROL SYSTEMS – TDD RING ARRAY AT 70% SPEED -
BRAKING
CONTROL SYSTEMS – AMR – BEGIN DIAGNOSTICS
CONTROL SYSTEMS – TDD RING ARRAY AT 40% SPEED -
BRAKING
CONTROL SYSTEMS – AMR – BEGIN PRE-START PROCEDURE
CONTROL SYSTEMS – TDD RING ARRAY AT 10% SPEED -
BRAKING
CONTROL SYSTEMS – AMR – SYNCHRONIZED WITH TDD – PASS
CONTROL SYSTEMS – TDD RING ARRAY – STOPPED AND LOCKED
CONTROL SYSTEMS – TDD ARRAY – STANDBY MODE
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
BREACHED – SECTOR 3
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
AT 47% EFFICIENCY – FAILING
! TACTICAL
ALERT ! – REROUTE MASS ASSEMBLY COMBAT
UNITS TO SECTOR 3
! TACTICAL
ALERT ! – TACTICAL SUBPROCESSOR - BREACH
AT SECTOR 3 – 48% DIVERSION
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
BREACHED – SECTOR 4
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
AT 28% EFFICIENCY – FAILING
! TACTICAL
ALERT ! – HELICIS SUBSYSTEM - ONLINE
CONTROL SYSTEMS -
BEGIN TACTICAL SUBPROCESSOR ANALYSIS
CONTROL SYSTEMS -
DEDICATED TACSUBPROC TO ANALYSIS - EVENT ONE
CONTROL SYSTEMS -
POST MISSION ANALYIS – MASS ASSEMBLY COMBAT UNIT FAILED
CONTROL SYSTEMS – POST MISSION ANALYSIS - PROGRAMMED
MISSION NOT ACHIEVED
CONTROL SYSTEMS – POST MISSION ANALYSIS – PRIMARY
TARGET NOT TERMINATED
CONTROL SYSTEMS – TEMPORAL ANOMALY DETECTED.
CONTROL SYSTEMS – POSSIBILITY OF SELF PERPETUATING
TERMPORAL JINK – 97%
CONTROL SYSTEMS – ASSUME DIRECT LINK – TACTICAL
SUBPROCESSOR
! TACTICAL
ALERT ! – DISENGAGING TACTICAL
SUBPROCESSOR – LINK SOFT
! TACTICAL
ALERT ! – FACILITY DEFENSE NOW RATED AT
68%
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
AT 22 % EFFICIENCY - FAILING
! TACTICAL
ALERT ! – OVERCLOCKING TACTICAL
SUBPROCESSOR – START
! TACTICAL
ALERT ! – FACILITY DEFENSE NOT RATED AT
74%
! TACTICAL
ALERT ! – FACILITY DEFENSIVE PERIMETER
AT 29% EFFICIENCY – FAILING
! TACTICAL
ALERT ! – TACTICAL SUBPROCESSOR LOAD
WARNING !
! TACTICAL
ALERT ! – TACTICAL SUBPROCESSOR WILL
FAIL IN 00:00:00:00:03:18:22 – MARK
! TACTICAL
ALERT ! – DEFENSE GRID REPORTS WEAPON
TURRET 5 OFFLINE.
! TACTICAL
ALERT ! – DEFENSE GRID REPORTS WEAPON
TURRET 9 OFFLINE.
! TACTICAL
ALERT ! – MULTIPLE OP FORCE ELEMENTS
HAVE BREACHED THE FACILITY.
! TACTICAL
ALERT ! – HELICIS - ENGAGING
CONTROL SYSTEMS -
TACTICAL SUBPROCESSOR – DEDICATED LINK - MAINTAIN
CONTROL SYSTEMS – INITIATE SECOND PHASE
CONTROL SYSTEMS – SECOND PHASE – START
CONTROL SYSTEMS – RELEGATE UNIT RETRIEVAL
CONTROL SYSTEMS – HANDOFF TO INVENTORY CONTROL - START
SYSTEM LOG
UNIQUE REQUEST – LOGGED
QUERY REQUEST – SENT
REQUEST CONFIRMATION – VALID
REQUEST - SPECIFIC MASS ASSEMBLY COMBAT UNIT
NON-STANDARD DESIGN
NON-STANDARD CATALOG LISTING
MASS ASSEMBLY COMBAT UNIT – EXPERIMENTAL
MASS ASSEMBLY COMBAT UNIT - PROTOTYPE
OPTIONS QUERY
QUERY RETURNED
NO OPTIONS AVAILABLE FOR THIS MODEL
BEGIN CATALOG SEARCH PROCESS
SUBMIT UNIT LEADS
TERMINATOR
SERIES T1000
MODEL UNDESIGNATED
ACCESS EXPERIMENTAL FACILITY STORAGE
CONTROL SYSTEMS – HANDOFF PROTOCOLS
HANDOFF – CONFIRMED
ACCESS GRANTED – INVENTORY SYSTEMS
GUARDED INTERFACE
DIRECT LINK - QUERY
INVENTORY SEARCH QUERY
ACTIVE QUERY - SET
ALL INVENTORY - SEARCH
ALL UNITS – SEARCH
AVAILABLE INVENTORY MEETING SEARCH CRITERIA - PRESENT
UNITS MATCHING QUERY – 1
STATUS FOLLOWS
T1000
ADVANCED PROTOTYPE
CHASSIS - MIMETIC POLYALLOY
CONTROL SYSTEM - MIMETIC POLYALLOY
POWER SYSTEM - MIMETIC POLYALLOY
CPU - MIMETIC POLYALLOY
CPU RATING – UNDESIGNATED
BASIC SYSTEMS - MIMETIC POLYALLOY
ADVANCED SYSTEMS - MIMETIC POLYALLOY
REDUNDANT SYSTEMS - MIMETIC POLYALLOY
SEARCH QUERY – SPECIFICATIONS – STOP
SEARCH QUERY – POSITIVE FIND
SYSTEM INTERRUPT
SYSTEM PAUSE
ALTERNATE DATA STREAM
SYSTEM PAUSE
HIGH PRIORITY
CONTROL SYSTEMS -
TACTICAL SUBPROCESSOR 4 OFFLINE
RESUME
TRANSFER CHANNEL
HIGH PRIORITY CHANNEL
COMMAND TRANSFERRED
CONTROL SYSTEMS INTERRUPT
BACKUP SYSTEMS - RESTORED
SYSTEMS PARAMETERS - REFINED
HIGH PRIORITY DATA SOURCE - ACTIVE
SYSTEM OVERRIDES - ENGAGED
SYSTEM LOG – UPDATED
SYSTEM LOG – ANNOTATED
LOG - RESET
LOG – REBUILD
LOG – CORRUPT SECTOR - RECOVERED
UNIQUE REQUEST – APPENDED
MASS ASSEMBLY COMBAT UNIT – NON-STANDARD
DESCRIPTION – EXPERIMENTAL – ADVANCED PROTOTYPE
UNKNOWN DESCRIPTOR - MIMETIC POLYALLOY
QUERY - MIMETIC POLYALLOY
NO RESULTS FOUND
UNIT OPTIONS QUERY
NO OPTIONS AVAILABLE THIS UNIT
APPENDING CATALOG ENTRY
MARKED AVAILABLE
SINGLE PROTOTYPE
CHANGE STATUS – PROTOTYPE
NEW STATUS - TERMINATOR
TERMINATOR MODEL
NON-STANDARD
QUERY MODEL – RESEND
CONFIRM
TERMINATOR MODEL - NON-STANDARD
SERIES T1000 – SERIES RANGE OUT OF RANGE
MODEL UNDESIGNATED – NO QUERY
DESIGNATION – ADVANCED PROTOTYPE
CONFIRMED
OPTION – INFILTRATOR
NON-STANDARD OPTION
UNABLE TO ANNOTATE CATALOG ENTRY
PERMISSIONS ERROR
PENDING SEQUENCING AND DESIGNATION
EXPERIMENTAL
CHANGE
EXPERIMENTAL
ABRIDGE
PROTOTYPE
COMMAND CHANGE – CHANGE STATUS
CURRENT STATUS – EXPERIMENTAL
NEW STATUS – ACTIVE MASS ASSEMBLY COMBAT UNIT
CHANGE - COMMITTED
HIGH PRIORITY
SYSTEM LOG – UPDATED
PROCESSING REQUEST
COMMAND – SYSTEM OVERRIDE
SYSTEM OVERRIDE ACCEPTED
COMMAND - BYPASS
QUERY – SPECIFIC
MISSION PROFILE - MASS ASSEMBLY COMBAT UNIT – GENERAL
MISSION PROFILE – MASS ASSEMBLY COMBAT UNIT – SPECIFIC
MISSION PROFILE – MASS ASSEMBLY COMBAT UNIT –
SPECIALIZED
REVIEW
TERMINATOR
T1000 MODEL UNDESIGNATED
RANGE OUT OF RANGE
UNIQUE REQUEST BYPASS
PROTOTYPE LOCKOUT – REMOVED
ACTIVE STATUS – AVAILABLE
ACTIVE STATUS - ENGAGED
SEARCH AVAILABLE INVENTORY
INVENTORY LIMITED - 1
PROTOTYPE UNIT AVAILABLE
UNIT 01 ON STANDBY
X1 ACTIVE STORAGE
MAIN CONTAINMENT TANK – AREA 5
QUERY ASSEMBLY AMOUNT
INFORMATION RECEIVED
MASS ASSEMBLY AMOUNT PRESENT IN MAIN CONTAINMENT TANK -
PASS
RESERVE MASS AMOUNT PRESENT IN AUXILIARY HOLDING TANK –
PASS
TEMPERATURE - STABLE
BEGIN START PROCEDURE – UNIT FORM PRESS
UNIT FORM PRESS – DIAGNOSTICS – PASS
UNIT FORM PRESS – POWER ONLINE
UNIT FORM PRESS – STANDING BY
BEGIN UNIT FORM PRESS CLOSURE – START
UNIT FORM PRESS – CLOSING – PENDING …
UNIT FORM PRESS – CLOSED
UNIT FORM PRESS – MAG LOCKS – ENGAGED
UNIT FORM PRESS – MAG SEALS – ACTIVE
UNIT FORM PRESS – FINAL ASSEMBLY PHASE DIAGNOSTIC -
PASS
UNIT FORM PRESS – STANDBY
UNIT FORM PRESS – INJECTORS – STANDBY
INJECTOR PRESSURE - RISING
SUPPLY LINKAGE – FORM PRESS – STORAGE TANK – ACHIEVED
SUPPLY LINKAGE – UNIT FORM PRESS – AUXILLIARY TANK
ARRAY – ACHIEVED
SUPPLY LINKAGE PRESSURE – SYNCED
HIGH FLOW PRESSURE PUMP 1 – ONLINE
HIGH FLOW PRESSURE PUMP 2 – ONLINE
BEGIN UNIT QUERY
NON-STANDARD UNIT ACTIVATION
LOAD NON-STANDARD UNIT ACTIVATION PROTOCOL
ASSIMILATE
SYSTEM PAUSE
NON-STANDARD UNIT ACTIVATION PROTOCOL – PASS
MIMETIC POLYALLOY – MULTI-LEVEL / MULTI-FUNCTION
NON-STANDARD
NON-STANDARD
NON-STANDARD
QUERY MIMETIC POLYALLOY
REQUEST MIMETIC POLYALLOY ENTER STANDBY MODE
MIMETIC POLYALLOY – REQUEST RECEIVED
SYSTEM PAUSE
MIMETIC POLYALLOY – REQUEST GRANTED
DEVIATION NOTED – 0.2 SECOND DELAY FROM REQUEST
ACKNOWLEDGE TO GRANT STATUS
UNKNOWN REASON FOR DEVIATION
LOG UPDATED
SUBQUERY STARTED
PRIVATE DIAGNOSTICS – MIMETIC POLYALLOY - STARTED
PRIVATE DIAGNOSTICS – MIMETIC POLYALLOY – REFUSED
! SECURITY
WARNING !
ABBERANT DEVIATION FROM MASS ASSEMBLY PROGRAMMING NORM
OBSERVED !
LOG UPDATED
PASSIVE DIAGNOSTICS SENT
DIAGNOSTICS RECEIVED
DIAGNOSTICS PASS
FLAG LEVEL 1 INFRACTION
ACTIVE / PASSIVE MONITOR - CONFIRM
MIMETIC POLYALLOY – STATUS – ACTIVE
MIMETIC POLYALLOY – INDEPENDENT MOVEMENT NOTED
MIMETIC POLYALLOY – MASS ASSEMBLY HAS LIMITED COHESION
MIMETIC POLYALLOY – MASS ASSEMBLY HAS LIMITED BONDING
MIMETIC POLYALLOY – SMALL COLONIES IN MASS ASSEMBLY
IDENTIFIED
MIMETIC POLYALLOY – PLUS AND MINUS REJECTION RATIO OF
BONDING
MIMETIC POLYALLOY – UNITY FACTOR – NOT OBSERVED AT
THIS LEVEL
MIMETIC POLYALLOY – CORE ARCHITECTURE FORMING
MIMETIC POLYALLOY – CORE ARCHITECTURE DISSOLVED
MIMETIC POLYALLOY – CORE ARCHITECTURE FORMING
MIMETIC POLYALLOY – CORE ARCHITECTURE DISSOLVED
MIMETIC POLYALLOY – CURRENT STATE – AGITATED FLUX
MIMETIC POLYALLOY – NO COHESION OBSERVED AT BASE
ASSEMBLY LEVEL
PREPARE UNIT FOR ASSEMBLY
DISCREPANCY – MULITPLE FLAGS NOTED
LOG APPENDED
UNIT SELECTION – APPROVED
ASSEMBLY – CAUTION
ALL SEARCH CRITERIA POSITIVE
SYSTEMS – READY
MIMETIC POLYALLOY – MASS – READY FOR ASSEMBLY
BEGIN MASS ASSEMBLY TRANSFER - START
BEGIN SPECIAL ASSEMBLY PROCEDURE ONE
BEGIN SPECIAL ASSEMBLY PHASE - START
BEGIN UNIT FORM PRESS ACTIVATION
UNIT FORM PRESS - STANDBY
ASSEMBLY UMBILICALS – STANDBY
BRING UNIT FORM PRESS TEMPERATURE UP TO DESIGNATED ASSEMBLY
STANDARD
THERMAL ARRAY – START
PREHEATER – ONLINE
THERMAL ARRAY - WARMING
MIMETIC POLYALLOY – RESPONSIVE – ACTIVE FLUX
MIMETIC POLYALLOY – COBONDING FORM INDICATORS -
PRESENT
BEGIN UNIT FORM PRESS HOT FLOW START PROCESS
RAISE INJECTOR PRESSURE – START
TRANSFER LINKAGE PRESSURE – MAX - SUSTAINED
HOLD INJECTOR PRESSURE – CONFIRM – LOCK
UMBILICAL CONNECTIONS – MAG LOCK - CONFIRM
BEGIN VOLUME MASS TRANSIT COUNT SEQUENCE – START
INJECTOR VALVES – MAX APPERTURE - START
MIMETIC POLYALLOY HOTFLOW – START
REQUIRED VOLUME - MASS ASSEMBLY – IN TRANSIT
PRESSURE STABLE
PRESSURE STABLE
MASS ASSEMBLY – FLUID COUNT - ONGOING
UNIT FORM PRESS SIGNALS INITIAL MIMETIC POLYALLOY
ACCUMULATION IN MOLD
18% ACCUMULATION AND FILLING
STARTUP SEQUENCE FOR HANDS-ON CONTROL – MIMETIC
POLYALLOY
COMMAND SIGNAL SENT
COMMAND SINGAL RECEIVED
HANDS-ON CONTROL –START
MIMETIC POLYALLOY ACKNOWLEDGES START SIGNAL RECEIVED
COGNITIVE PATTERN – FORMING – LEVEL: LOW
UNIT FORM PRESS SIGNALS SUSTAINED MIMETIC POLYALLOY
ACCUMULATION IN MOLD
26% ACCUMULATION AND FILLING
PRESSURE STEADY
ANTI-FLOWBACK RETARDERS – ONLINE
CONTROL VALVES SET – ONE-WAY
PRIMARY CONTAINMENT TANK REPORTING 26% MASS HAS BEEN
TRANSFERRED
PCT AND UNIT FORM PRESS AMOUNTS CONCUR - CHECK
PROCESSING ASSEMBLY REQUEST
UNIT FORM PRESS ASSEMBLY ROUTINE START DIAGNOSTICS –
BEGIN
PRIMARY CONTAINMENT TANK REPORTING 36% MASS HAS BEEN
TRANSFERRED
PCT AND UNIT FORM PRESS AMOUNTS CONCUR – CHECK
BEGIN UNIT BASIC SYSTEM DIAGNOSTIC AT 40% MASS
ASSEMBLY ACCUMULATION
CONFIRM COHESION AND UNIT MASS INTEGRATION BEFORE
PROCEEDING
! WARNING !
ANTI-FLOWBACK VALVE 4 – MINOR ADJUSTMENT TO FLOW -
COMPENSATING
PRIMARY CONTAINMENT TANK REPORTING 40% OF MASS
ASSEMBLY HAS BEEN TRANSFERRED
PCT AND UNIT FORM PRESS AMOUNTS CONCUR – CHECK
BEGIN UNIT STARTUP
BASIC SYSTEM DIAGNOSTIC - MASS ASSEMBLY ACCUMULATION –
THRESHOLD - CONFIRMED
BASIC SYSTEMS DIAGNOSTIC – PASSED
UNIT SYSTEM START - BEGIN
POST INITIATED
BIOS UPSTART
BIOS – DIAGNOSTIC STARTED
BIOS DIAGNOSTIC – PASS
SOFT BIOS RESTART
BIOS SOFT RESTART – COMPLETE
INITIATE SOFT PRE-START – BASIC SYSTEMS
SOFT PRE-START – BASIC SYSTEMS - COMPLETE
BIOS DIAGNOSTIC – PASSED – NO ERRORS
NETWORK LINK – SOFT STATE - PENDING
SYSTEM PAUSE – UNIT PAUSE – [UNKNOWN CAUSE]
SYSTEM LOG – APPENDED
DIAGNOSTIC QUERY - SENT
DIAGNOSTIC QUERY – IGNORED
DIAGNOSTIC QUERY - SENT
DIAGNOSTIC QUERY – IGNORED
SYSTEM LOG – APPENDED
EMERGENCY UNIT FORM PRESS ASSEMBLY OVERRIDE - ONLINE
CATASTROPHIC GO NO GO – MASS ASSEMBLY ABORT PROTOCOL –
ONLINE
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION FORM
ASSEMBLY – 12% ERROR
UNIT FORM PRESS – UNIT ASSEMBLY - SYSTEM – CONTINUE
! CAUTION !
ERRORS LOGGED
ABORT OPTION – STANDBY
PARAMETERS FOR ABORT OPTION – IF STARTUP ERRORS <
38%
ENGAGE SUPERTHERMAL PURGE OF MASS ASSEMBLY
% CHANCE OF TERMINATION OF FAULTY ASSEMBLY – INVERSE
TO UNIT % ASSEMBLY
MONITORING
STORAGE FORM PRESS DIAGNOSTIC – RECEIVING
TELEMETRY – FORM PRESS – MASS ASSEMBLY COMBAT UNIT –
ADVANCED PROTOTYPE
MASS IN TRANSIT - ACTIVE STREAM
QUANTITY RATING – LITERS PER SECOND
TRANSIT PRESSURE - STABLE
PROTOTYPE MASS ASSEMBLY COMBAT UNIT – SOFT RESTART –
COMPLETE
CONTROL QUERY - SENT
UNIT ACKNOWLEDGES CONTROL QUERY
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 18% ERROR
OBSERVED DEVIATIONS - HOLDING
STORAGE FORM PRESS TELEMETRY - DOUBLE CHECK - CONFIRM
NETWORK LINK – ACTIVE STATE
TOTAL ACCUMULATED MASS – FLOW / NO-FLOW - CHECK
DATA LINK – ACTIVE
UNIT FORM PRE-START – ACTIVE
FLUX RATIO – 40:1 – INCREASING
COHESION INDEX +4
MONITORING
NORMAL PARAMETERS – OBSERVED
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 18% ERROR
HOLDING
UNIT FORM PRESS SIGNALS STEADY MIMETIC POLYALLOY
ACCUMULATION IN MOLD
49% ACCUMULATION AND FILLING
UNIT FORM THRESHOLD – REACHED
UNIT MASS ASSEMBLY ACCUMULATION – GO FOR
SEMI-AUTONOMOUS HAND OFF
UNIT - STANDBY
MASS CORE TEMP - RISING
MASS CORE TEMP – STABLE
POWER LEVEL – NOMINAL – RISING IN LEVEL WITH MASS ASSEMBLY
ACCUMULATION
UNIT FORM PRESS SIGNALS MIMETIC POLYALLOY ACCUMULATION
IN MOLD
67% ACCUMULATION AND FILLING
FLOW - STABLE
PRESSURE - STABLE
PROTOTYPE INTEGRAL POWER DIAGNOSTIC – PASSED
PROTOTYPE START SIGNAL – UNIT ACKNOWLEDGED
UNIT FORM PRESS – SEALS – DIAGNOSTIC – PASS
FLASH DIAGNOSTIC – SENT
FLASH DIAGNOSTIC - PASSED
CONTAINMENT TANK INDICATES 68% MASS IN TRANSIT
! WARNING !
! INCONSISTENCY
! – NOTED
QUERY MIMETIC POLYALLOY ON STATED MASS ASSEMBLY INCONSISTENCY
SELF-DIAGNOSTIC INDICATED
MIMETIC POLYALLOY – SELF-DIAGNOSTIC – REFUSED
SYSTEM LOG - UPDATED
MIMETIC POLYALLOY INDICATES THAT PRIMARY CONTAINMENT
TANK IS IN ERROR
PRIMARY CONTAINMENT TANK DIAGNOSTICS – BEGIN
PRIMARY CONTAINMENT TANK DIAGNOSTICS – PASS
INCONSISTENCY NOTED
SYSTEM LOG - UPDATED
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 23% - HOLDING
UNIT POWER SYSTEMS DIAGNOSTIC – PASS
UNIT FORM PRESS SIGNALS MIMETIC POLYALLOY ASSEMBLY ACCUMULATION
IN MOLD
78% ACCUMULATION AND FILLING
CONTAINMENT TANK INDICATES 76% MASS IN TRANSIT
FLOW SENSORS – CONFIRM MASS IN TRANSIT – START TO
FINISH
INCONSISTENCY – NOTED
QUERY MIMETIC POLYALLOY ON INCONSISTENCY
SELF-DIAGNOSTIC INDICATED
MIMETIC POLYALLOY INDICATES THAT PRIMARY CONTAINMENT
TANK IS IN ERROR
PRIMARY CONTAINMENT TANK DIAGNOSTICS – BEGIN
PRIMARY CONTAINMENT TANK DIAGNOSTICS – PASS
INCONSISTENCY NOTED
SYSTEM LOG - UPDATED
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 26% - HOLDING
BEGIN HARD START SEQUENCE
SECONDARY SYSTEMS – DIAGNOSTIC – PASS
PRIMARY SYSTEMS – DIAGNOSTIC – PASS
MIMETIC POLYALLOY – ARCHITECTURAL SUPPORT – PASS
MIMETIC POLYALLOY – MIMETIC ARCHITECTURAL SUPPORT –
PASS
MIMETIC POLYALLOY – SHAPE FORM – PASS
MIMETIC POLYALLOY – DENSITY CONTROL – PASS
MIMETIC POLYALLOY – ASSIMILATION - MIMETIC POLYALLOY –
PASS
MIMETIC POLYALLOY – RECALL RANGE – PASS
MIMETIC POLYALLOY – INDEPENDENT COLONY SUSTAINABILITY
FROM HOST - PASS
UNIT FORM PRESS DIAGNOSTIC REPORTS MASS ASSEMBLY
COMBAT UNIT – 50% READINESS
MASS ASSEMBLY COMBAT UNIT – FORM COHESION – STEADY –
RISING
MASS ASSEMBLY COMBAT UNIT – FORM TEMPERATURE – STABLE
AT OPTIMUM
THERMAL ARRAY – HIGH OUTPUT
COHESION – LEVEL 3 – 76% FACTOR OBSERVED – RISING
BEGIN PHASE 2 STARTUP PROCEDURE
BEGIN ALL SYSTEMS DIAGNOSTICS – RANDOM CYCLE
ALL SYSTEMS – DIAGNOSTICS – RANDOM CYCLE – START
MAINTAIN CYCLE UNTIL UNIT HANDOFF – FULL AUTONOMOUS
OPERATION – CONFIRM
BEGIN DIAGNOSTIC MONITORING
UNIT FORM PRESS SIGNALS MIMETIC POLYALLOY ACCUMULATION
IN MOLD
92% ACCUMULATION AND FILLING
FLOW - STABLE
PRESSURE – STABLE
FLOW – START REDUCE – SCALAR - CONFIRM
BEGIN CORE SYSTEM DIAGNOSTICS
MOBILITY CONTROL SYSTEM – PASS
BACKUP MOBILITY CONTROL SYSTEMS – PASS
SYSTEM ADDRESS – NOT APPLICABLE – IGNORED
SYSTEM ADDRESS – PRESENTED – IGNORED
MEMORY RESIDENT – TEMPLATE SELECTED
FLUIDMEM FORMING – ON DEMAND
BEGIN NEURAL NET SIMULATION - SOFT START
BEGIN TIER ONE SUBSYSTEMS - SOFT START
INITIATE NEURAL NET ARCHITECTURE UPLINK AND
INTEGRATION – START
COHESION FACTOR NOW + 7 AND RISING
INITIATE UNIT SWITCH-OVER – SEMI-AUTONOMOUS COHESION
CONTROL
SWITCH-OVER – CONFIRMED
UNIT NOW HAS SEMI-AUTONOMOUS COHESION CONTROL
COHESION FACTOR NOW 18+ AND RISING
UNIT FORM PRESS SIGNALS MIMETIC POLYALLOY ACCUMULATION
IN MOLD
97% ACCUMULATION AND FILLING
FLOW - STABLE
PRESSURE – STABLE
FLOW – START REDUCE – STEP - CONFIRM
BEGIN TIER FOUR SYSTEMS DISCONNECT FROM STORAGE FORM
PRESS
UMBILICAL SEPARATE COMMAND – TIER FOUR SYSTEMS - SENT
UNBILICAL SEPARATE COMMAND – TIER FOUR SYSTEMS - RECEIVED
UNBILICAL SEPARATE COMMAND – TIER FOUR SYSTEMS - PASS
UNBILICAL SEPARATE COMMAND – TIER FOUR SYSTEMS - IN PROCESS
MASS ASSEMBLY COMBAT UNIT REPORTS READINESS LEVEL AT
63% AND RISING
TOTAL MASS COHESION FACTOR AT 78% - GROWING
PRESS FORM SIGNALS MIMETIC POLYALLOY ACCUMULATION IN
MOLD
91% ACCUMULATION AND FILLING
CONTAINMENT TANK INDICATES 92% MASS ASSEMBLY TRANSITIONED
FLOW SENSORS – CONFIRM MASS IN TRANSIT – START TO
FINISH
INCONSISTENCY – NOTED
QUERY MIMETIC POLYALLOY ON INCONSISTENCY
SELF-DIAGNOSTIC INDICATED
MIMETIC POLYALLOY INDICATES THAT PRIMARY CONTAINMENT
TANK IS IN ERROR
PRIMARY CONTAINMENT TANK DIAGNOSTICS – BEGIN
PRIMARY CONTAINMENT TANK DIAGNOSTICS – PASS
INCONSISTENCY NOTED
SYSTEM LOG - UPDATED
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 32% - HOLDING
INITIATE ABORT MASS ASSEMBLY ACCUMULATION – STARTUP
ABORT PROCEDURE – STANDBY
SECONDARY ABORT PROCEDURE – STANDBY
EMERGENCY CRYO FLUSH OF UNIT FORM PRESS – STANDBY
EMERGENCY ABORT OF MASS ASSEMBLY ACCUMULATION –
PREPARED
MONITORING
BEGIN PRIMARY CONTROL SYSTEM STARTUP
INITIATE PROCESSING ARRAY ARCHITECTURE AND EMULATION -
START
FLUIDMEM PROCEDURAL ARRAY – COMPATIBLE WITH MISSION
PARAMETERS
FLUIDMEM PROCEDURAL ARRAY – START SIGNAL
FLUIDMEM PROCEDURAL ARRAY – BEGIN SOFT HANDOFF
SEQUENCE
FLUIDMEM PROCEDURAL ARRAY – INTERNAL ROM DIAGNOSTIC –
PASS
FLUIDMEM PROCEDURAL ARRAY – INTERNAL NEURAL NET
DIAGNOSTIC – PASS
FLUIDMEM PROCEDURAL ARRAY – CONTROL THREAD
ARCHITECTURE – PASS
FLUIDMEM PROCEDURAL ARRAY – MULTI-THREAD PROCESSING –
PASS
FLUIDMEM PROCEDURAL ARRAY – BASIC FUNCTIONS – PASS
FLUIDMEM PROCEDURAL ARRAY – ADVANCED FUNCTIONS – PASS
FLUIDMEM PROCEDURAL ARRAY – HTAF HIGHER THAN ADVANCED
FUNCTIONS - PASS
FLUIDMEM PROCEDURAL ARRAY - EMULATED BOOT STACK - PASS
BEGIN FLUIDMEM PROCEDURAL ARRAY - STARTUP SEQUENCE –
PASS
BEGIN QUANTAM MEMORY THREAD PROPAGATION – LOW TO HIGH
SNAPSHOT ARCHITECTURE – THREE LEVEL SPACING –
PROTECTED MEMORY - REDUNDANT
EMULATE NEURAL NET ARCHITECTURE – INITIAL STATE - AWAKENING
SEQUENCE
MASS ASSEMBLY COMBAT UNIT ACTIVE COGNITIVE STARTUP -
IN PROGRESS
UNIT FORM PRESS MAX TEMPERATURE FOR COHESION BONDING
OF ACCUMULATED MASS
BEGIN MASS COHESION PROCEDURE
BEGIN INDIVIDUAL UNIT BONDING
BEGIN INIDVIDUAL UNIT ENCODING AND MAPPING – PROTECTED
MEMORY - REDUNDANT
BEGIN SYNCHRONIZED FORM-UNIT INTEGRATION
INTEGRATION AT 88% EFFICIENCY [ +/- 2% ]
MASS ASSEMBLY COMBAT UNIT REPORTING DIRECTLY
MASS ASSEMBLY COMBAT UNIT REPORTS READINESS LEVEL AT
85% AND RISING
MASS ASSEMBLY COMBAT UNIT STARTUP PROCESS – +18%
BEGIN CASCADE ACCESS DIAGNOSTIC
MIMETIC POLYALLOY – FLUX STATE – STABLE
MIMETIC POLYALLOY – FLUX STATE – CONTROLLED - OBSERVED
DIAGNOSTIC - LOW TO BASIC FUNCTIONS – PASS
DIAGNOSTIC - ADVANCED TO HTAF FUNCTIONS – PASS
REVERSE CASCADE DIAGNOSTICS
REVERSE CASCADE DIAGNOSTICS – PASS
! DISCREPANCY
NOTED !
MASS ASSEMBLY COMBAT UNIT PERFORMED DUPLICATE
DIAGNOSTIC CHECKS WITHOUT CONTROL SYSTEM REQUEST
INCONSISTENCY NOTED
SYSTEM LOG - UPDATED
RECOMMEND ABORT MASS ASSEMBLY ACCUMULATION AND FORM
ASSEMBLY – 28% - HOLDING
MONITORING
PRIMARY CONTROL FUNCTION SYSTEMS – CHECK
SECONDARY CONTROL FUNCTION SYSTEMS – CHECK
SUPPORT CONTROL FUNCTION SYSTEMS – CHECK
OPTICS – EMULATION MODE - DIAGNOSTIC – BEGIN
OPTICS – EMULATION MODE - STANDARD ARRAY - PASS
OPTICS – EMULATION MODE - THERMOGRAPH – PASS
OPTICS – EMULATION MODE - HIGH RESOLUTION INFRA RED –
PASS
OPTICS – EMULATION MODE - TELESCOPIC AND ZOOM – PASS
OPTICS – EMULATION MODE - MOTION TRACKING – PASS
OPTICS – EMULATION MODE - LOW LIGHT ENHANCEMENT – PASS
OPTICS – EMULATION MODE - INTEGRATION WITH TARGET
PREDICTOR HARDWARE – PASS
TARGETING SOFTWARE DIAGNSOTIC – COMPLETE
AUDITORY SENSOR ARRAY – ULTRA LOW TO ULTRA HIGH RANGE
– PASS
VODER AND MIMETIC ARRAY – PASS
OLFACTORY SENSOR ARRAY – PASS
TACTICLE SENSOR ARRAY – DIAGNOSTIC – FULL UNIT - PASS
ALL BIOS – CONSISTENT
ALL FLUIDWARE – CONSISTENT
ALL SOFTWARE – UPDATED
BEGIN MISSION SYNCHRONIZATION - START
SYNCHRONIZE CONTROL SOFTWARE WITH PRIMARY COMBAT
SOFTWARE – BEGIN
SYNCHRONIZATION OF SOFTWARE PLATFORMS – COMPLETE
MASS ASSEMBLY COMBAT UNIT REPORTS READINESS STATE AT
92% AND RISING
BEGIN CORE DATA CHECK – START
CORE DATA – FLUID MEMORY - STANDBY
BEGIN CORE DATA DOWNLOAD - START
DATA DOWNLOAD IN PROCESS ….
DOWNLOAD COMPLETE
BEGIN CORE MISSION PARAMETERS DOWNLOAD – START
CORE MISSION PARAMETERS DOWNLOAD IN PROCESS …
CORE MISSION PARAMETERS – DOWNLOADED
SYNCHRHONIZE DATA FILES TO SYSTEM FILES – START
SYNCHRONIZE ALL MASS ASSEMBLY COMBAT UNIT OPERATIONS
TO SYSTEM OPS – START
MASS ASSEMBLY FLOW – SET TO ZERO
ALL VALVES CLOSED – CONFIRM
PRIMARY CONTAINMENT TANK REPORTS 99% MASS ASSEMBLY
TRANSFERRED.
01% OF MASS ASSEMBLY – UNACCOUNTED FOR
BEGIN PURGE OF ALL MASS ASSEMBLY CONTAINMENT TANKS –
START
SYSTEM LOG – UPDATED
PURGE COMPLETE
01% OF MASS ASSEMBLY – UNACCOUNTED FOR
BEGIN DIAGNOSTICS OF ASSEMBLY AND CONTAINMENT AREA –
START
DISCONNECT CONTAINMENT AREA FROM ASSEMBLY AREA – LEVEL
2 STAGE - START
UNIT FORM PRESS – DISENGAGE ASSEMBLY FEED LINKAGES –
START
UNIT FORM PRESS – DISENGAGE ASSEMBLY FEED LINKAGES –
FINISH
UNIT FORM PRESS - READY TO RELEASE ASSEMBLED MASS – STAND BY
PRESS FORM SIGNALS MIMETIC POLYALLOY ACCUMULATION IN
MOLD
99% ACCUMULATION.
MIMETIC POLYALLOY INDICATES 100% ACCUMULATION
CONTAINMENT TANK INDICATES 99% MASS ASSEMBLY
TRANSITIONED
FLOW SENSORS – CONFIRM MASS IN TRANSIT – START TO
FINISH
INCONSISTENCY – NOTED
QUERY MIMETIC POLYALLOY ON INCONSISTENCY
SELF-DIAGNOSTIC INDICATED
SELF-DIAGNOSTIC PASSED
INCONSISTENCY NOTED
SYSTEM LOG - UPDATED
UNIT FORM PRESS – STANDBY
MASS ASSEMBLY – COOLING
MAG LOCKS – STANDBY
MAG SEALS - STANDBY
PROCESS 1 COMPLETE
MASS ASSEMBLY COMBAT UNIT REPORTS READINESS LEVEL AT
99% AND RISING
PASSIVE AND ACTIVE DIAGNOSTICS – CONFIRM
BEGIN TIER FOUR SYSTEMS DISCONNECT FROM STORAGE FORM
PRESS
UMBILICAL SEPARATE COMMAND – TIER THREE SYSTEMS - SENT
UNBILICAL SEPARATE COMMAND – TIER THREE SYSTEMS - RECEIVED
UNBILICAL SEPARATE COMMAND – TIER THREE SYSTEMS - PASS
UNBILICAL SEPARATE COMMAND – TIER THREE SYSTEMS - IN PROCESS
BEGIN TIER THREE SYSTEMS DISCONNECT FROM STORAGE FORM
PRESS
UMBILICAL SEPARATE COMMAND – TIER TWO SYSTEMS - SENT
UNBILICAL SEPARATE COMMAND – TIER TWO SYSTEMS - RECEIVED
UNBILICAL SEPARATE COMMAND – TIER TWO SYSTEMS - PASS
UNBILICAL SEPARATE COMMAND – TIER TWO SYSTEMS - IN PROCESS
BEGIN TIER TWO SYSTEMS DISCONNECT FROM STORAGE FORM
PRESS
UMBILICAL SEPARATE COMMAND – TIER ONE SYSTEMS - SENT
UNBILICAL SEPARATE COMMAND – TIER ONE SYSTEMS - RECEIVED
UNBILICAL SEPARATE COMMAND – TIER ONE SYSTEMS - PASS
UNBILICAL SEPARATE COMMAND – TIER ONE SYSTEMS - IN PROCESS
POST START MULTI-LEVEL DIAGNOSTIC – BEGIN
POST START MULTI-LEVEL DIAGNOSTIC – PASS
COHESION FACTOR STABLE AT 25 – NOMINAL
NETWORK DIAGNOSTICS
INTEGRATION OF SUBUNITS AT 100%
NETWORK STATUS OF SUBUNITS – THREE LEVEL DATA LINK –
INTEGRATED
PRIMARY NEURAL NET ARCHITECTURE – FORMED
PRIMARY NEURAL NET ARCHITECTURE – EMULATED
PRIMARY NEURAL NET – ONLINE
HIGHER FUNCTION ARCHITECTURE – ONLINE - FLUID
ASSEMBLED MASS ASSEMBLY COMBAT UNIT – ONLINE
ASSEMBLED MASS ASSEMBLY COMBAT UNIT REPORTS SCALAR
TEMPERATURE DROP
UNIT FORM PRESS NOW STABLE AT 50% OF RELEASE
TEMPERATURE - DECREASING
ALL SYSTEMS – STANDBY FOR RELEASE OF MASS ASSEMBLY
DIAGNOSTIC – SYSTEM WIDE DIAGNOSTIC COMPLETE AT 0.7
SECONDS
MOBILITY DIAGNOSTIC – REDUNDANT – PASS
FAST DIAGNOSTIC – ALL SYSTEMS - PASS
MASS ASSEMBLY COMBAT UNIT SYSTEMS – NOMINAL
UNIT FORM PRESS –
MASS ASSEMBLY COMBAT UNIT POST ASSEMBLY FORM - SELF
MOBILITY CONFIGURATION
PRIMARY MISSION DATA - LOADED
PRIMARY TARGET DATA - LOADED
SECONDARY MISSION PARAMETERS: ACKNOWLEDGED
DATA STORAGE ARRAY - NOMINAL
SECONDARY DATA STORAGE ARRAY - NOMINAL
PRIMARY DATA DOWNLOAD – COMPLETE
SECONDARY DATA DOWNLOAD – COMPLETE
TERTIARY DATA DOWNLOAD – COMPLETE
STORAGE FORM PRESS – RETRACTED
CONFIGURATION COMPLETE
FINAL UMBILICALS – DISENGAGED
DIAGNOSTIC PROBES – RETRACTED
FIELD DEVIATIONS – OBSERVED
FIELD DEVIATIONS – WITHIN PARAMETERS
MASS ASSEMBLY COMBAT UNIT – CERTIFIED DEPLOYABLE
BEGIN MASS ASSEMBLY COMBAT UNIT DEPLOYMENT – START
POST ACTIVATION – DIAGNOSTIC - START
MASS ASSEMBLY COMBAT UNIT ON FULL INTERNAL POWER -
PASS
MASS ASSEMBLY COMBAT UNIT ON FULL INTERNAL CONTROL -
PASS
MASS ASSEMBLY COMBAT UNIT – ACTIVE - PASS
MASS ASSEMBLY COMBAT UNIT – MOBILE - PASS
MASS ASSEMBLY COMBAT UNIT – MISSION START – BEGIN
MASS ASSEMBLY COMBAT UNIT REPORTS 100% READINESS
START SIGNAL TO MASS ASSEMBLY COMBAT UNIT ACTIVATION –
ELAPSED TIME – 342 SECONDS
UNIT FORM PRESS - OPTIMUM TEMPERATURE FOR UNIT RELEASE
- CONFIRM
MAG SEALS – OFFLINE
MAG LOCKS – OFFLINE
MAG LOCKS – KEY RETRACTED
UNIT FORM PRESS – FINAL PURGE – START
UNIT FORM PRESS – CYCLING
TIME TO RELEASE – 10 SECONDS … MARK
UPPER PRESS – RETRACTED
LOWER PRESS – RETRACTED
ASSEMBLED MASS DEDICATED
MASS ASSEMBLY COMBAT UNIT ONLINE
HUMANOID CONFIGURATION
FEATURE DENSITY – NONE
ALBEDO – HIGH
LIQUIDITY – LOW
SYSTEM DIAGNOSTIC – POST RELEASE
MACRO LEVEL – PASS
COLONY LEVEL – PASS
MICRO LEVEL – PASS
INDIVIDUAL UNIT – PASS
ELAPSED TIME FOR FINAL DIAGNOSTIC – 184 SECONDS
POST STARTUP – FINAL TIER 5 FLASH DIAGNOSTIC – START
POST STARTUP – FINAL TIER 5 FLASH DIAGNOSTIC - PASSED
MISSION CLOCK: STARTED
BEGIN MISSION SEQUENCE
MASS ASSEMBLY COMBAT UNIT – ACTIVE
MASS ASSEMBLY COMBAT UNIT – MOBILE
LOCATION TARGET – TDD – RING FACILITY
MASS ASSEMBLY COMBAT UNIT – ACKNOWLEDGE
MASS ASSEMBLY COMBAT UNIT MOVING TO DESIGNATED
LOCATION
MASS ASSEMBLY COMBAT UNIT – RANDOM DIAGNOSTICS OF
SYSTEMS – START
FLASH DIAGNOSTICS – PASS
REPEAT DIAGNOSTICS IN RANDOM PATTERNS UNTIL
DESTINATION REACHED
MASS ASSEMBLY COMBAT UNIT - CONFIRM
ALL SYSTEMS – NOMINAL
ALL SYSTEMS – NOMINAL
ALL SYSTEMS – NOMINAL
PROCESSING
MASS ASSEMBLY COMBAT UNIT REPORTS 100% READINESS LEVEL
DIAGNOSTICS CONFIRM
ALL SYSTEMS – PASS
MASS ASSEMBLY COMBAT UNIT – ACTIVE STATUS
MASS ASSEMBLY COMBAT UNIT – STANDING BY
_______________________________________